Projects

Development of an optimum wind farm layout using four met masts

Site: Western Canada

Results:

  • The influence of the nearby sea is strongly overestimated by the model, this could be solved through a modified modelling of the roughness lengths.
  • Poor quality of the met mast data, inconsistent anemometer data
  • Due to

Wind farm optimisation of 40 planned wind turbines

Site: Bosnia-Herzegovina

Results:

  • Due to a pronounced main wind direction, the lay-out was modified to a single row instead of two rows. Small spacing between the turbines was adopted in change.
  • With this lay-out, more turbines could be placed on